Work portfolio | Through September 22, 2026 — live in production, both instances coexisting

Cassidy Marble

Team Lead, Backstage subject-matter expert, and DevOps engineer on the Finastra platform workstream, delivered as a consultant through BlankFactor (now Globant). This portfolio groups work into completed, ongoing, and planned items, and notes plainly where a specific role contribution was not documented.

106kLOC monolith decomposed
9plugin repos, ≥80% coverage
71recorded decisions
0manual steps per deploy
1.0.0fleet-wide stable promotion

Backstage refresh

Extraction of plugins into their own repositories, refreshed architecture, migration planning, entity model, own-domain go-live, and continuous legacy-parity porting.

Open project page

GitOps delivery platform

The DevOps deep dive: Flux image automation, workload-identity secrets, an in-cluster private npm registry, self-hosted CI runners, and a first deploy that ran hands-off end to end.

Open deep dive

Debugging case files

Five production diagnosis stories — a phantom resource deleter caught with a probe matrix, an impossible login root-caused from vendored source, and more. Symptom, investigation, root cause, fix, lesson.

Open case files

Project timeline

The whole arc, dated: from a 106k-line monolith and a blank plan on August 8 to a production GitOps deployment on August 20 — including the days things broke, and what did and didn't compress.

Open the timeline

Grafana integration

Read-only dashboards, alerts, catalog ingestion, API design, and stack scaffolding.

Open project page

Platform integrations

Jira, TechDocs, Nexus, templates, scorecards, and landing-zone alignment.

Open project page

Technical leadership

Planning, team enablement, code review, stakeholder preparation, and delivery reporting.

Open project page

Backstage deep dive

Technical walkthrough of the migration itself: architecture, phases, decisions, quality metrics, and the cutover plan.

Open deep dive

Skills honed for this role